Check the Toilet Room: Single-User Restroom Clearances and Grab Bars lesson plan

Occupational-therapy, interior-design and construction students tape a single-user restroom at full size, check six clearances with a wheelchair route, and red-line what fails.

Free, no sign-up, and no print needed. A life-size floor print is optional: school prints are $0.45 per printed sq ft, $100 minimum.

On this page: Teach it in 5 steps · Learner card · Printable

Classroom setup sketch for Check the Toilet Room (Single-User Restroom Clearances and Grab Bars), showing the room layout, tape lines and team spots

At a glance

  • Time: 45 minutes

  • Level: Postsecondary CTE, apprenticeship, college

  • Subject: CTE & trades: Single-User Restroom Clearances and Grab Bars

  • Grouping: Teams of 3: inspector, user, recorder.

  • Space: A 7 ft x 8 ft area per team.

  • Included: Teacher script, scenario sheet, learner sheet, exit ticket and answer key with every number worked

Open the printable lesson: script, scenario, learner sheet and answer key (PDF) →


Teach it in 5 steps

The whole lesson on one screen. Details for each step are further down.

  1. Before class: Tape a 7 ft x 8 ft room with the toilet, lavatory and grab bars at the as-designed positions on the scenario sheet.

  2. Show them (5 min): Hook. "A few inches decide whether someone can use this room alone."

  3. Try it together (20 min): Measure. Teams measure the six checks with the tape and the loop.

  4. Teams work (13 min): Run steps 3-3 of the procedure below: Red-line.

  5. Check (7 min): Exit ticket: A toilet centerline is 19 in from the side wall. Pass for 16-18 in?


Learner card

Read this part with your class, or print it for each team.

Your challenge
The restroom is framed next week. Check it the way an inspector and a wheelchair user will, and red-line every fix while it is still tape.

By the end, I can:

  • measure turning space and fixture clearances in a restroom

  • judge each against stated accessibility criteria

  • red-line the smallest fix for each failure

Who uses this
occupational therapists, interior designers, architects, inspectors and contractors, who review restrooms before the walls close.


Essential question

What makes a restroom usable for everyone, and how do you prove it before it is built?


What learners learn and show

  • The big idea: A restroom works or fails by inches: the turning circle, the toilet's distance from the wall, the clear floor and the grab bars all have stated minimums.

  • Show it: a check sheet with six measurements, pass or fail for each, and a red-line fix for every failure.

Objectives

  • Tape the room, toilet, lavatory and grab bars from the scenario.

  • Measure the six checks.

  • Judge each against the quoted criteria.

  • Red-line the fixes.


Materials and prep

  • Painter's tape, a 60-in string loop

  • Tape measures

  • The printable: scenario sheet and check sheet

Prep

  1. Tape a 7 ft x 8 ft room with the toilet, lavatory and grab bars at the as-designed positions on the scenario sheet.

  2. Make a 60-in turning loop.

  3. Print one check sheet per team.

Space: A 7 ft x 8 ft area per team.

Grouping: Teams of 3: inspector, user, recorder.


Lesson procedure

  1. 0-5 min, Hook: "A few inches decide whether someone can use this room alone." Ask: Where would you check first? Listen for: Turning space and the toilet.

  2. 5-25 min, Measure: Teams measure the six checks with the tape and the loop. Ask: Which fail? Listen for: Turning space: clear circle, Water closet centerline to side wall, Side grab bar length.

  3. 25-38 min, Red-line: Teams write the smallest fix for each failure on the sheet. Ask: Smallest fix for the centerline? Listen for: Move the toilet 2 in toward the side wall (to 18 in or less).

  4. 38-45 min, Exit ticket: Individual exit ticket.


Checks for understanding

  • Ask: Why is the toilet centerline a range, not a minimum? Look for: Too far from the wall puts the grab bar out of reach.

  • Ask: Why test turning space with a loop? Look for: The circle has to fit every direction at once.

  • Ask: Why check before the walls close? Look for: Moving tape is free; moving a toilet flange is not.


Exit ticket

  1. A toilet centerline is 19 in from the side wall. Pass for 16-18 in? Answer: No: 1 in too far.

  2. A side grab bar is 36 in; it needs 42. Short by? Answer: 6 in.

  3. Name one check that needs a circle, not a line. Answer: The 60-in turning space.

Scoring: 1 point each, plus 1 for complete red-lines. 3 or more = secure.


Common misconceptions

  • Learners may think: A big enough room is automatically accessible. Address it: Area doesn't place the toilet, bars or clear floor correctly.

  • Learners may think: Grab bars can be any length. Address it: Each has a stated minimum length.


Supports and extensions

Give the criteria card with each number and its section.

Multilingual learners: label toilet, lavatory, grab bar and turning space on the floor.

Mobility: a wheelchair user can lead the route test if they choose.

Transfer task: Check a single-user restroom on campus (with permission) and write three findings.


Why at full scale

The user role tests the room in a chair at full size; that is the whole point of the clearances.


Codes, standards and frameworks

Codes and standards change and are adopted locally. This lesson teaches the method; use the edition your jurisdiction or program has adopted.


Ready to teach it?

The printable has the teacher script, the scenario sheet, the learner sheet and the answer key. Open the printable lesson →

Need the floor plan itself? Get a 1:1 print quote.


Paying for the print? Use a grant

Many teachers fund the 1:1 print with Perkins V career and technical education funds. Start from From Drawing to Takeoff: a construction-trades pathway on life-size plans, our grades 9-12 CTE grant packet, and add this lesson to its timetable. The packet has a project description, measurable objectives, a lesson timetable, an evaluation plan, a budget and a principal letter, written to the questions funders ask.

Download the grant packet (PDF) · Editable Word version · All funding options


Related lessons

More in the College & Trades track: The MacLeamy Curve · The Pre-Pour Walk · The Slab Takeoff · Square the Layout · Receptacle Layout to Code · Measure It Like an Appraiser · Walk the Patient Room · The Owner Walk · Equipment Footprints and Service Clearances · Space Planning Review · Occupant Load and Exits · Plan the Sales Floor · Set the Banquet Room · The Site Logistics Plan · Walk the Kitchen Line · The Tenant Test Fit · Lab Safety Layout · Lay Out the Stair · Place the Smoke Alarms · Plan the Child Care Room · Rack the Warehouse · Lay Out the Parking Lot · Roof Takeoff from the Plan · Space the Sprinkler Heads · Lay Out the Tile

Browse all 100 floor plan lesson plans · Standards map

bottom of page